Infrastructure

Backup, recovery and virtualisation

We agree how much data you can afford to lose and how long each system can be down, design backup and virtualisation around those targets, and prove them with a timed restore test. Planned moves from VMware to Proxmox or Hyper-V are included.

Infrastructure
On site in Cyprus, remote in the UK and Europe
You receive
Design, migration plan, test record
Duration
4 to 10 weeks
Where
On site in Cyprus, remote elsewhere
Price
Fixed, quoted after a 30 minute call
Language
English or Turkish

1.0When this helps

  • VMware licence costs have changed and the renewal date is close.
  • Backups exist, but nobody knows how long a full restore would take.
  • There is no copy of the data outside the building.

2.0Scope

  • Recovery targets (RPO and RTO) agreed for each system
  • Backup design with an offline or immutable copy
  • Choice of virtualisation platform with a licence cost comparison
  • Migration plan with a rollback step for every stage
  • Supervised migration and a timed restore test

3.0You receive

  • Design document with the recovery targets
  • Migration runbook
  • Signed restore test record with measured times

4.0What we need from you

From you

  • Administrator access during agreed windows
  • A decision on which systems matter most
  • Budget approval for any new storage or licences

Not included

  • Hardware and licence sales
  • Application level migrations inside the virtual machines
  • 24/7 cover during the migration

Thirty minutes is usually enough to see where the risks are.

Tell us what you run and what worries you. We reply within two working days.

Book a call